通天山行大道 G0711乌尉高速全线通车
Xin Lang Cai Jing·2025-12-27 15:38

Core Viewpoint - The G0711 Urumqi to Yili Expressway (referred to as "U-Y Expressway") will begin trial operations on January 1, 2026, significantly improving transportation connectivity between northern and southern Xinjiang [1]. Group 1: Project Overview - The U-Y Expressway spans 324.7 kilometers, featuring 274 bridges and 17 tunnels, with the starting point at the Urumqi city ring road and the endpoint in Yili County, Bazhou [3]. - Travel time from Urumqi to Korla will be reduced from 7 hours to 3.5 hours, transforming the transportation landscape and facilitating day trips and weekend travel [3]. Group 2: Engineering Achievements - The Tian Shan Victory Tunnel, a key project in the middle section, is 22.13 kilometers long and holds two world records: the "longest highway tunnel" and the "deepest vertical shaft in a highway tunnel" [5]. - The construction integrates advanced technologies in long tunnel design, construction, smart building, and operational safety, providing a "Chinese solution" for the successful construction and safe operation of long tunnels [5]. Group 3: Economic Impact - The U-Y Expressway connects the Urumqi metropolitan area, northern Xinjiang urban belt, and southern Xinjiang urban cluster, enhancing resource exchange and circulation between these regions [7]. - As part of the national expressway network G7, it links with major highways like G7 Jingxin Expressway and G30 Lianhuo Expressway, playing a crucial role in the development of the Eurasian Golden Passage and serving as a gateway for western openness [7].