Core Viewpoint - The "South Water" project has significantly improved water supply in Beijing, addressing the city's water resource challenges and expanding its reach to more residents [1][5]. Group 1: Water Supply Infrastructure Development - The "South Water" project has been operational in Beijing for 11 years, with a cumulative water intake of 11.57 billion cubic meters [1]. - The daily water supply capacity of the South-to-North Water Diversion plants in Beijing has reached 4.99 million cubic meters, benefiting over 16 million residents [1]. - New water plants, such as the Mentougou and Haidian hot spring water plants, are set to begin operations, with the latter being the first in Beijing to use low-pressure high-strength ultraviolet disinfection technology [2][3]. Group 2: Smart Water Supply Systems - A remote automated control system for the South-to-North Water Diversion project was implemented in August, enhancing operational efficiency and reducing manual errors by over 50% [4]. - The system utilizes advanced sensor technology to monitor critical data such as valve positions and flow rates, allowing for precise control and real-time transparency in water distribution [4]. Group 3: Future Plans and Sustainability - The Beijing Water Authority plans to continue expanding water plant construction and source replacement to ensure more residents benefit from the "South Water" project [5]. - Future initiatives will focus on smart water management, green technologies, and integrated urban-rural water supply systems to enhance efficiency and sustainability [5].
超1600万市民喝上甘甜“南水”
Bei Jing Wan Bao·2025-12-28 06:46