Core Viewpoint - China Shenhua (01088) announced the successful completion of the 4th unit of the Beihai Phase II expansion project, which has now entered commercial operation after a 168-hour trial run [1] Group 1: Project Details - The Beihai Phase II project consists of two 1 million kilowatt ultra-supercritical once-through coal-fired generating units, both of which are now operational [1] - The trial operation period showed stable performance of the units, with environmental indicators being excellent [1] Group 2: Environmental Standards - Emission concentrations of smoke, sulfur dioxide, and nitrogen oxides are significantly below ultra-low emission standards, reaching levels comparable to gas-fired power generation units [1] Group 3: Regional Impact - With the commissioning of Beihai Phase II, Beihai Power has become the largest supportive and adjustable power source in the region, providing strong support for the safety and stability of the regional power grid and the construction of a new power system [1]
中国神华(01088):北海二期4号机组通过168小时试运行