Core Points - The Xi'an Metro Line 15 Phase I will commence initial operations on December 29 at 11:00 AM, marking the completion of the city's third phase of rail transit construction, with the total operational mileage reaching 422 kilometers [1] - The new line features a total length of 19.4 kilometers with 13 underground stations, enhancing the urban rail network and facilitating seamless transfers with existing lines 2, 4, and 6 [2] Summary by Sections Operational Details - The first and last train times for Dongzhaoyu Station are 06:15 and 23:00, while for Xiliu Station, they are 06:00 and 22:45, providing a total operational service duration of 17 hours and 31 minutes, with a minimum train interval of 5 minutes and 30 seconds [1] - The ticket pricing follows a distance-based pricing system, with a full fare of 5 yuan and a maximum fare of 13 yuan, and all stations support QR code scanning and facial recognition for boarding [1] Technical Features - The line is equipped with smart stations and utilizes the highest level of automation with the G0A4 fully automated operation system, featuring A-type trains capable of reaching speeds up to 100 km/h [1] - The line employs a mixed operation mode of 4/6 train formations to accommodate passenger flow patterns, with a one-way travel time of approximately 29 minutes [1] Urban Impact - As a major east-west trunk line in the southern part of the main urban area, the opening of Line 15 will enhance the urban rail network, alleviate traffic congestion, and promote rapid development in sectors such as science and technology, education, and cultural tourism in the southern region of Xi'an [2]
西安地铁15号线明日开通运营
Xi An Ri Bao·2025-12-29 04:16