Core Viewpoint - The announcement details the investment and operational structure of the Danba Hydropower Station, highlighting its significance within the Dadu River hydropower planning framework [1] Group 1: Project Overview - The Danba Hydropower Station is located in Danba County, Ganzi Tibetan Autonomous Prefecture, Sichuan Province, and is the 9th stage of the Dadu River hydropower planning, with a total installed capacity of 1.15 million kilowatts [1] - The station consists of four 275,000-kilowatt mixed-flow turbine generator units and one 50,000-kilowatt ecological unit [1] Group 2: Investment Structure - The project is jointly established by the company's subsidiary, Guoneng Dadu River Basin Hydropower Development Co., Ltd., Sichuan Tieneng Power Development Co., Ltd., and Contemporary Amperex Technology Co., Ltd., with a shareholding ratio of 56.11%, 33.89%, and 10% respectively [1] - The total dynamic investment for the project is 15.273 billion yuan, with a capital ratio of 30%, while the remaining funding will be secured through bank loans [1] Group 3: Financial Commitment - Based on the dynamic total investment and the shareholding ratio in the project company, Dadu River Company will directly invest 2.571 billion yuan in the Danba Hydropower Station for investment, construction, and operational management [1] - The project has received approval from the National Development and Reform Commission and has obtained supportive documents for site selection, environmental assessment, and land use [1]
国电电力:控股子公司与宁德时代等共同投资大渡河丹巴水电站项目