Core Viewpoint - The renovation and expansion of Shoubi Street has been completed, improving traffic flow and accessibility in the area, significantly reducing travel time and enhancing local infrastructure [1][3][5]. Group 1: Traffic Improvement - The previously narrow section of Shoubi Street, which was only 8-9 meters wide, has been expanded to 22-25 meters, allowing for two lanes of traffic and connecting Zhao Dengyu Road with the West Second Ring Road [5]. - Travel time to the main road has decreased from 15 minutes to just 3 minutes, benefiting over ten thousand residents from nearby communities, schools, and units [5][16]. Group 2: Infrastructure Development - The project includes the construction of two underground automated parking garages with a total of 181 parking spaces, designed to optimize space and efficiency [6][8]. - An integrated underground utility corridor of 824 meters has been established, allowing for streamlined maintenance of water, electricity, and telecommunications, reducing repair times from 72 hours to 4 hours [10][12]. Group 3: Community Enhancement - Three pocket parks and several small green spaces have been developed along the road, contributing over 5,000 square meters of green area, which is expected to absorb more than 50 tons of carbon dioxide annually [14][16]. - The project aims to introduce commercial establishments such as shops and cafes in the future, which will create additional job opportunities and economic benefits for the community [16].
绕行15分钟变3分钟直达,白塔寺片区北侧的受壁街贯通了
Xin Lang Cai Jing·2025-12-29 13:04