Core Insights - The opening of Shoubi Street significantly reduces travel time for residents in the old city area, from 15 minutes to just 3 minutes to reach the West Second Ring Road, enhancing connectivity and accessibility [1][2] Group 1: Infrastructure Development - Shoubi Street connects the West Second Ring Road and Zhao Dengyu Road, benefiting over ten thousand residents from three residential communities, one apartment building, two kindergartens, and four primary schools [1][2] - The project includes an integrated construction model that combines roads, parking garages, utility tunnels, and parks, marking a first for the core area of Xicheng District [2][3] Group 2: Parking Solutions - The underground parking facility features two fully automated mechanical parking garages located 14 meters underground, capable of accommodating 181 vehicles [3] - The parking system utilizes a smart control system for efficient vehicle storage and retrieval, reducing the time to 150 seconds, which is a 40% improvement over traditional garages [3] Group 3: Environmental and Urban Planning - The project has achieved a dual revolution in underground space utilization, saving over 30% of land resources and enhancing overall project efficiency by more than two times compared to traditional road projects [4] - The development includes three pocket parks and several small green spaces, adding over 5,000 square meters of greenery, which is expected to absorb more than 50 tons of carbon dioxide annually [4]
老街坊盼了近十年 西城受壁街终畅通
Xin Lang Cai Jing·2025-12-29 18:15