Core Viewpoint - The Huadian Batang 1.2 million kilowatt photovoltaic power generation project has officially commenced operation, marking a significant step in China's clean energy initiatives and the implementation of the energy strong nation strategy in high-altitude regions [1][2]. Group 1: Project Overview - The project is located in the snow-capped highlands of Batang, Sichuan, at an altitude of 4000 to 5100 meters, featuring 2.17 million photovoltaic modules spread over 25,000 acres [1]. - It includes the construction of 122 kilometers of transmission lines and two 220 kV smart booster stations [1]. - The project set industry records during construction, including daily installation of 1,600 string units and the establishment of 15,800 piles [1]. Group 2: Technological Achievements - The project successfully overcame several technical challenges related to high-altitude conditions, such as ice resistance, seismic stability, and frozen soil foundation stability [1]. - It has accumulated valuable experience for the construction of large-scale photovoltaic projects in high-altitude areas [1]. Group 3: Economic and Environmental Impact - The project is expected to deliver 2.1 billion kilowatt-hours of green electricity annually to Central China, saving approximately 640,000 tons of standard coal and reducing carbon dioxide emissions by over 1.7 million tons [2]. - It plays a crucial role in ensuring national energy security, optimizing energy structure, promoting regional coordinated development, and supporting the achievement of carbon neutrality goals [2]. Group 4: Socioeconomic Contributions - During its construction, the project provided over 2,000 jobs for the local community, demonstrating a successful integration of engineering development with ecological protection and improvement of local livelihoods [1].
华电巴塘120万千瓦光伏项目正式投产发电
Zhong Guo Dian Li Bao·2025-12-30 07:23