轨道纵横密织网 地铁出行更快捷
Bei Jing Wan Bao·2025-12-30 08:29

Core Insights - The opening of new subway lines in Beijing has expanded the operational mileage of the city's rail network to 909 kilometers, with 30 operational lines and 539 stations, enhancing connectivity across various urban areas [1][7] Group 1: New Line Openings - The opening of the 17th line's middle section, the 18th line, and the southern extension of the 6th line has significantly increased the number of transfer stations to 106, facilitating quicker transfers for passengers [3][4] - The 18th line, spanning approximately 19.8 kilometers with 11 stations, connects key residential areas and business districts, reducing travel time significantly for commuters [6][7] - The 17th line now connects major residential and office areas, with travel time from the southern to northern ends reduced to 66 minutes, enhancing commuting efficiency [8] Group 2: Passenger Experience - The new transfer stations, such as Dahuomen Station, have improved convenience, allowing for direct transfers and reducing overall travel time for passengers [3][5] - The design of the new lines incorporates artistic elements, creating a pleasant travel atmosphere for passengers, with features like "light and shadow tunnels" and unique station decorations reflecting local culture [11][12] - The introduction of advanced facilities, such as carbon fiber electric heating seats and real-time information screens, enhances passenger comfort and experience [15][16] Group 3: Construction and Technology - The construction of the new lines faced challenges due to complex geological conditions and high construction risks, employing advanced technologies for safety and efficiency [19][21] - The 18th line is recognized as a demonstration line for smart construction, utilizing automated monitoring systems and energy-efficient technologies to optimize operations [21][22]

轨道纵横密织网 地铁出行更快捷 - Reportify