Core Insights - The Yalong River region has accelerated the construction of integrated hydropower and solar energy bases with the simultaneous commissioning of two 1 million kilowatt solar projects, the Suolong and Chaburang solar power stations [1] Group 1: Project Details - The Suolong solar power station is located in Litang County, Garze Tibetan Autonomous Prefecture, Sichuan Province, with an installed capacity of 1 million kilowatts [1] - The Chaburang solar power station is situated in Muli County, Liangshan Yi Autonomous Prefecture, Sichuan Province, also with an installed capacity of 1 million kilowatts [1] - Together with the Ke La Phase I and II solar power stations and the Erhekou hydropower station, these projects form a complementary system of 3 million kilowatts of hydropower and 3 million kilowatts of solar power [1] Group 2: Environmental Impact - The two solar power stations are expected to generate approximately 3.9 billion kilowatt-hours of clean electricity annually, saving about 1.2 million tons of standard coal and reducing carbon dioxide emissions by approximately 3.1 million tons each year [1] Group 3: Overall Capacity - With the commissioning of these two solar power stations, the Yalong River integrated hydropower and solar energy base has nearly 23 million kilowatts of clean energy capacity in operation and about 12 million kilowatts under construction [1]
雅砻江流域水风光一体化基地两座百万千瓦光伏电站同步投产
Xin Hua She·2025-12-31 03:04