HyOrc Completes Factory Acceptance Test of 500kw ORC Turbine for International Customer

Core Insights - HyOrc Corporation has successfully completed the Factory Acceptance Test (FAT) for its 500kW Organic Rankine Cycle (ORC) turbine, which is now ready for shipment to a project in Turkey [1][5]. Group 1: Factory Acceptance Test Details - The FAT was conducted by Bureau Veritas, a global testing, inspection, and certification group, on December 30, 2025, at HyOrc's manufacturing facility in Tamil Nadu, India [2]. - The inspection confirmed that the turbine met all required mechanical and operational criteria, with successful speed and RPM testing across multiple nozzle configurations, showing smooth acceleration and stable performance without any abnormalities [3]. Group 2: Company Overview and Future Plans - HyOrc Corporation specializes in developing and commercializing patented hydrogen-capable combustion and waste-to-fuel systems for various sectors, including shipping, rail, and off-grid power [6]. - The company has 737 million shares issued and is preparing for a Nasdaq uplist, indicating potential growth and increased visibility in the market [6].