总装机容量100万千瓦,年均发电20亿度,索绒光伏电站投产
Jing Ji Guan Cha Wang·2026-01-02 01:58

Core Viewpoint - The completion and commissioning of the Suorong Photovoltaic Power Station in the Yalong River Basin marks a significant development in renewable energy, contributing to a world-class water-solar complementary project with a total installed capacity of 3 million kilowatts for both hydropower and photovoltaic energy [1] Group 1: Project Details - The Suorong Photovoltaic Power Station is located in Litang County, Garze Tibetan Autonomous Prefecture, Sichuan Province, with an average elevation exceeding 4,400 meters and a maximum elevation of 4,700 meters [1] - The total installed capacity of the Suorong Photovoltaic Power Station is 1 million kilowatts [1] - The power station is part of a larger integrated base that includes the Kela Photovoltaic Power Station and the Lianghekou Hydropower Station, collectively forming a project with 3 million kilowatts of hydropower and 3 million kilowatts of photovoltaic energy [1] Group 2: Energy Production - The Suorong Photovoltaic Power Station is expected to generate an average of 2 billion kilowatt-hours of electricity annually [1]