我省首次成功实现地热能发电
Xin Lang Cai Jing·2026-01-02 20:34

Core Insights - The Jiangsu Province's key clean geothermal energy utilization demonstration project has achieved a significant milestone by successfully generating electricity from geothermal energy, marking the entry of deep geothermal resource development into the "electric era" [1] Group 1: Project Overview - The project is a collaboration between the Jiangsu Geological Survey Institute, the Natural Resources and Planning Bureau of Rudong County, and Jiangsu Yangtong Development Investment Co., Ltd [1] - The project utilizes high-quality geothermal resources from the "Yangshen 1 Well," which has a measured wellhead water temperature of 108°C and a daily water output exceeding 5,360 cubic meters [1] Group 2: Technological Achievements - The technical team successfully conducted a geothermal power generation test, achieving a single well power output exceeding 200 kW [1] - The project has established a "high-efficiency conversion + green protection" technical system, which is crucial for the promotion of "geothermal energy cascading utilization" [1] Group 3: Future Implications - The successful power generation test fills the gap in geothermal power generation in Jiangsu Province and lays a solid foundation for the subsequent construction of a comprehensive utilization demonstration project that integrates geothermal power generation, agricultural product drying, building heating/cooling, modern facility agriculture, and tailwater recharge [1] - The continuous and stable operation of the test validates the adaptability of the technical route under Jiangsu's specific geological resource conditions, marking a transition from "theoretical design" to "engineering verification" [1]