中企参建巴西布济乌斯油田六期项目投产
Xin Hua She·2026-01-03 03:08

Core Viewpoint - The Buzios Phase VI project, co-developed by China National Offshore Oil Corporation (CNOOC) and Brazil's Petrobras, is set to commence production on December 31, 2025, significantly enhancing Brazil's oil and gas output [1] Group 1: Project Details - The Buzios Phase VI project is located in the Santos Basin, with operational water depths ranging from 1,900 to 2,200 meters [1] - The project utilizes a "floating production storage and offloading unit + subsea production system" for deepwater saltwater development [1] - The designed daily crude oil production capacity is approximately 25,000 tons, while the natural gas processing capacity is 7.2 million cubic meters per day [1] Group 2: Impact on Production Capacity - With the launch of Phase VI, the total daily production capacity of the Buzios oil field will exceed 1.15 million barrels [1] - The project is expected to significantly contribute to Brazil's overall oil and gas production capabilities [1] Group 3: Technological and Environmental Aspects - The floating production storage and offloading unit incorporates energy-efficient technologies such as heat recovery and closed flaring systems, enhancing energy utilization efficiency and reducing carbon emissions [1] - The project exemplifies successful collaboration between China and Brazil in the development of ultra-deepwater oil fields, aligning resource development with technological innovation and green low-carbon transformation [1]