【环球财经】中企参建巴西布济乌斯油田六期项目投产
Xin Hua She·2026-01-03 03:28

Core Viewpoint - The Brazil oil company announced that the Buzios Phase VI project, co-developed by China National Offshore Oil Corporation (CNOOC), is set to commence production on December 31, 2025, enhancing the oil field's output significantly [1] Group 1: Project Details - The Buzios Phase VI project is located in the Santos Basin, with operational water depths ranging from 1,900 to 2,200 meters, utilizing a deepwater subsea development model with a "floating production storage and offloading unit + subsea production system" [1] - The project is designed to achieve a daily crude oil production capacity of approximately 25,000 tons and a natural gas processing capacity of 7.2 million cubic meters [1] - With the launch of Phase VI, the daily production capacity of the Buzios oil field will exceed 1.15 million barrels [1] Group 2: Technological and Environmental Aspects - The floating production storage and offloading unit of the Phase VI project not only demonstrates excellent production capacity but also incorporates energy-saving and carbon reduction technologies, such as heat recovery and closed flaring systems, significantly improving energy efficiency and reducing carbon emissions [1] - The project exemplifies successful collaboration and execution between Brazil and China in the development of ultra-deepwater oil fields, aligning resource development with technological innovation and green low-carbon transformation [1]

【环球财经】中企参建巴西布济乌斯油田六期项目投产 - Reportify