北京市新能源汽车充电桩增至47.9万个
Xin Lang Cai Jing·2026-01-04 20:04

Group 1: Electric Vehicle Infrastructure Development - The city aims to optimize the layout of charging infrastructure during the "14th Five-Year Plan" period to meet the growing demand for electric vehicle charging and support the development of the electric vehicle industry [1] - The number of charging piles in the city increased from 230,000 to 479,000, and the number of battery swap stations rose from 158 to 360 [1] - The total charging volume for electric vehicles increased from 1.5 billion kWh to 3.5 billion kWh [1] Group 2: Coal Consumption and Energy Transition - By 2025, the city plans to reduce coal consumption by approximately 12.33 million tons, bringing the total coal consumption down to around 250,000 tons [2] - The "coal-to-electricity" program aims to upgrade the distribution network, with 1.37 million households participating [2] - The city has completed a transaction of 1.526 billion kWh for green electricity to replace reduced electricity from gas-fired power plants [2] Group 3: Green Transportation Initiatives - By 2025, the proportion of green travel in the central urban area is expected to reach 76.5%, an increase of 2.5 percentage points from 2020 [3] - The electrification rate of operational vehicles in the transportation sector is projected to exceed 46% by the end of 2025, with 100% of taxi vehicles being electric [3] - The city is focusing on building a green freight transport system, with a goal of achieving a 12% green transport ratio for goods by 2025 [3]

北京市新能源汽车充电桩增至47.9万个 - Reportify