Group 1: Transportation Infrastructure - The total railway operating mileage in China is expected to reach 165,000 kilometers by the end of 2025, with high-speed rail exceeding 50,000 kilometers, marking the largest and most advanced high-speed railway network in the world [2] - During the 14th Five-Year Plan period, the national railway operating mileage will increase from 146,300 kilometers to 165,000 kilometers, representing a growth of 12.8%, while high-speed rail will grow from 37,900 kilometers to 50,400 kilometers, a growth of 32.98% [2] Group 2: Energy Sector Developments - The annual electricity transmission volume of the "West-to-East Power Transmission" project by the Southern Power Grid is projected to reach 261.6 billion kilowatt-hours by 2025, an increase of 9.8% year-on-year, setting a new historical record [3] - In the Guangdong-Hong Kong-Macao Greater Bay Area, the demand for electricity is experiencing rigid growth due to the booming digital economy and advanced manufacturing, making Guangdong the first province in China to exceed a power load of 160 million kilowatts [3] Group 3: Oil and Gas Production - The Longqing Oilfield's second oil production plant in Gansu is expected to surpass 4 million tons in oil and gas production by 2025, achieving a historical high [3] - The second oil production plant has enhanced technological innovation, applying horizontal well volume fracturing technology, which has increased the average daily output of horizontal wells by 3 to 5 times compared to conventional wells [3] - The plant has also contributed to regional industrial structure optimization, producing a cumulative total of 2 billion cubic meters of natural gas since its development, with a daily gas production of 2 million cubic meters, effectively meeting the gas demand of 2.6 million residents in the Qinyang area [3]
“成绩单”出炉 我国交通、能源等多领域取得重大进展
Xin Lang Cai Jing·2026-01-05 00:10