江苏省首次成功实现地热能发电
Xin Hua Ri Bao·2026-01-05 01:28

Core Viewpoint - The Jiangsu Province's key clean geothermal energy utilization demonstration project has achieved a significant milestone by successfully generating electricity from geothermal energy, marking the entry of deep geothermal resource development into the "electric era" [1] Group 1: Project Overview - The project is a collaboration between the Jiangsu Geological Survey Institute, the Natural Resources and Planning Bureau of Rudong County, and Jiangsu Yangtong Development Investment Co., Ltd [1] - The project utilizes high-quality geothermal resources from the "Yangshen No. 1" well, which has a measured wellhead water temperature of 108°C and a daily water output exceeding 5,360 cubic meters [1] Group 2: Technological Achievements - The technical team successfully conducted a geothermal power generation test, achieving a single well power output exceeding 200 kW [1] - The project has established a "high-efficiency conversion + green protection" technical system, which is crucial for advancing the "cascaded utilization of geothermal energy" [1] Group 3: Future Implications - The successful power generation test fills the gap in geothermal power generation in Jiangsu Province and lays a solid foundation for the subsequent construction of a comprehensive utilization demonstration project that integrates geothermal power generation, agricultural product drying, building heating/cooling, modern facility agriculture, and tailwater recharge [1] - The continuous and stable operation of this test validates the adaptability of the technical route under specific geological resource conditions in Jiangsu, marking a transition from "theoretical design" to "engineering verification" [1]