金风科技助力全国首个高速服务区风电项目投运
Xin Lang Cai Jing·2026-01-05 10:32

Core Viewpoint - The Ninghu Expressway Xianrenshan Service Area Wind Power Project has officially been connected to the grid, marking it as the first wind power project at a highway service area in China, showcasing a model for integrated zero-carbon service areas and promoting the scale of "energy and transportation integration" [1][3]. Group 1: Project Overview - The project utilizes GWH171-5.6MW wind turbines, expected to generate approximately 13 million kilowatt-hours annually, and will integrate with existing distributed photovoltaic systems, charging facilities, and energy storage systems to create a smart energy system [1][4]. - The project aims to achieve over 100% self-sufficiency in green electricity and carbon neutrality, with nearly 100% rates for green electricity consumption and replacement, establishing the service area as a "green hub" on the highway [1][4]. Group 2: Implementation Challenges - The service area experiences high traffic, with an average daily vehicle flow of about 30,000 and pedestrian flow of approximately 70,000, necessitating careful planning and execution of the installation to minimize traffic disruption [2][4]. - The project team from Goldwind Technology employed a sand table planning approach and customized transportation solutions to significantly reduce traffic impact during the installation process [2][4]. Group 3: Future Collaborations and Goals - The successful implementation of this project is a result of collaboration between Goldwind Technology and Jiangsu Communications Control, with plans for a zero-carbon tunnel project in 2024, which will utilize GWH191-4.55MW turbines to generate over 23 million kilowatt-hours annually [5]. - By October 2025, the Ministry of Transport has established 19 pilot zero-carbon highway service areas, aiming for 100% green electricity supply through renewable energy sources, with a target of 5 million kilowatts of non-fossil energy capacity by 2027 [3][5].

GOLDWIND-金风科技助力全国首个高速服务区风电项目投运 - Reportify