Core Viewpoint - The Huizhou Ecological Environment Bureau has officially accepted the environmental impact assessment for the Zengjiang Longmen Section Governance Project, which has a total estimated investment of 389.52 million yuan and a construction period of 24 months [1][3]. Group 1: Project Overview - The Zengjiang Longmen Section Governance Project is a key livelihood project aimed at enhancing regional flood control capabilities, covering a governance length of 50.4 kilometers [3]. - Major construction activities include the construction and reinforcement of embankments, bank protection, and the establishment of drainage stations, sluices, and drainage pipes [3]. - Upon completion, the flood control standards will be significantly improved, with the urban area achieving a 50-year flood protection level, densely populated towns at a 20-year level, and villages at a 10-year level [3]. Group 2: Public Participation and Transparency - The public participation phase for the environmental impact assessment was completed successfully by the end of 2025, with no opposition received during the public consultation period [5][7]. - The public was informed through various channels, including online platforms, newspapers, and on-site postings in ten targeted villages and communities along the project route [6]. - The public can provide feedback or inquire about the project during the 10 working days of the acceptance announcement, ensuring transparency and public oversight [4].
惠州一重点民生项目总投资约3.9亿元,环评受理公示
Nan Fang Du Shi Bao·2026-01-05 15:18