Group 1 - The core project is the 2×1000 MW peak-shaving thermal power project by Zhejiang Energy Wuwei, which is a key supporting facility for the "Long Electric into Zhejiang" ultra-high voltage direct current project, with a static investment of 7.08 billion yuan [1][2] - The project aims to stabilize and support the large-scale renewable energy output, ensuring reliable electricity delivery, with an expected annual power generation of 90 billion kWh and annual revenue of approximately 2.4 billion yuan [2][3] - The project is expected to create over 800 jobs and significantly contribute to the economic and social development of the Hexi region, optimizing energy resource allocation between eastern and western China [2][3] Group 2 - Gansu Zhongchao Energy Technology Co., Ltd. has established an intelligent production line with an annual capacity of 3 million supercapacitors, which began construction in August 2023 and is expected to be operational by September 2024 [3][4] - Supercapacitors are positioned as a new type of energy storage device with high power density, capable of rapid charge and discharge, and are environmentally friendly, making them ideal for new power system applications [3][4] - The production line is projected to achieve an annual output value of 1.2 billion yuan, enhancing the local new energy industry chain and technological empowerment [4]
东西协作共筑能源新动脉——武威“陇电入浙”调峰电源及中超容储能项目建设一线观察
Xin Lang Cai Jing·2026-01-06 00:55