“十五五”首台核电机组投产,国家能源集团大比例参股
Zhong Guo Dian Li Bao·2026-01-06 07:37

Core Insights - The commercial operation of the Zhangzhou Nuclear Power Unit 2 marks a significant milestone in China's nuclear power development, with the entire first phase of the Zhangzhou Nuclear Power project now fully operational [1][4]. Group 1: Project Overview - Zhangzhou Nuclear Power is the starting point for the mass construction of the "Hualong One" nuclear technology and is the largest base for this technology globally, with plans to build six "Hualong One" nuclear units [4]. - The "Hualong One" technology is a third-generation pressurized water reactor developed in China, representing a significant advancement in the country's nuclear capabilities and contributing to its goal of becoming a nuclear power leader [4]. Group 2: Environmental Impact - Each "Hualong One" unit can generate up to 10 billion kilowatt-hours of electricity annually, reducing carbon dioxide emissions by approximately 8.16 million tons, equivalent to a reduction of over 3 million tons of standard coal consumption each year [4]. - Once fully operational, the Zhangzhou Nuclear Power base is expected to provide around 60 billion kilowatt-hours of clean electricity annually, optimizing the power distribution in Fujian Province [4]. Group 3: Technological Advancements - The non-safety grade DCS control system for Units 1 and 2 utilizes the EDPF-NU platform, developed by a subsidiary of the State Energy Group, which is tailored for nuclear power applications, ensuring high reliability and safety [5]. - The same platform will be used for the core support of Units 3 and 4, indicating a commitment to advanced technology in future developments [5]. Group 4: Historical Timeline - The Zhangzhou Nuclear Power project has a significant timeline, with the establishment of the project in November 2007, the formation of the Zhangzhou Energy Company in November 2011, and the completion of the first phase in January 2026 [5].