青岛元旦三天供水超222万立方米
Qi Lu Wan Bao·2026-01-06 11:12

Core Viewpoint - The Qingdao Water Supply Group successfully ensured a stable water supply during the New Year holiday, achieving a daily average supply of approximately 740,000 cubic meters and a total supply of 2.2223 million cubic meters over three days, with zero incidents and zero waiting time for services [2][3]. Group 1: Safety Measures - The company held a special meeting to initiate a holiday supply guarantee plan, conducting multiple risk assessments for potential low-temperature freezing situations and formulating detailed response measures [3]. - A comprehensive safety inspection was carried out across water plants, pump stations, and construction sites to identify and rectify safety hazards related to operational processes, equipment, water quality monitoring, and emergency material reserves [3]. Group 2: Water Supply Management - Utilizing a smart water supply scheduling system, the company monitored water pressure, flow, and reservoir levels 24/7 to accurately assess water demand and optimize production and pressure management [4]. - Water plants adhered strictly to production standards and enhanced equipment inspections to ensure stable operation of water production facilities, preparing for potential peak water usage periods [4]. Group 3: Water Quality Assurance - The company implemented a comprehensive water quality monitoring system from source to tap, increasing the frequency of water quality tests and real-time monitoring of key indicators to ensure compliance with national standards [5]. - Enhanced inspections of pipelines and secondary water supply pump stations were conducted to safeguard the drinking water safety of residents [5]. Group 4: Emergency Response - An emergency repair team was on standby 24/7 to address potential pipeline failures, with a well-coordinated response system in place to ensure rapid problem resolution [6]. - The customer service hotline operated continuously during the holiday, handling 669 inquiries and ensuring timely follow-up on all resident water needs [7]. Group 5: Employee Commitment - The successful holiday water supply was attributed to the dedication of the staff, who prioritized their responsibilities over personal celebrations, ensuring operational safety and service quality [7].