天赐材料:公司百吨级硫化锂及固态电解质中试线预计下半年完成产线建设
Core Viewpoint - Tianqi Materials (002709) is currently in the process of obtaining preliminary approval for its hundred-ton lithium sulfide and solid-state electrolyte pilot production line, with construction expected to be completed in the second half of 2026 [1] Group 1 - The company is focused on developing a pilot production line for lithium sulfide and solid-state electrolytes [1] - The construction of the production line is anticipated to be finalized by the second half of 2026 [1]