Core Insights - Transocean Limited (RIG) has secured a new contract and an extension for its offshore drilling units, adding approximately $168 million to its backlog [1][8] Contract Details - The Deepwater Mykonos drillship has been contracted by BP for a 302-day campaign in Brazil, expected to commence in Q3 2026, contributing around $120 million to the backlog [2][8] - The Transocean Enabler semi-submersible rig has had its contract extended with Equinor in Norway, adding $48 million to the backlog and securing an additional 105 days of work until September 2027 [3][8] Rig Specifications - The Deepwater Mykonos drillship features an Enhanced Samsung 10000 design, capable of drilling to a maximum depth of 35,000 feet and accommodating up to 205 personnel [2] - The Transocean Enabler rig is designed with a GVA 4000 NCS configuration, with a maximum drilling depth of 8,500 meters and operational capabilities in water depths of 500 meters [3]
Transocean's New Deals in Brazil & Norway Add $168M to Firm Backlog