Core Viewpoint - IsoEnergy Ltd. is initiating a bulk sample program at its Tony M uranium mine in Utah to gather essential data for a potential production restart, capitalizing on the increasing demand for domestic uranium supply in the U.S. [1][3] Group 1: Bulk Sample Program Details - The bulk sample program will extract up to 2,000 tons of mineralized material over a 12-14 week period, starting in late December 2025, using contract mining services from GenX Mining Contractors, LLC [2][3] - The extracted material will be processed at the White Mesa Mill in Utah, owned by Energy Fuels Inc., which eliminates the need for new mill construction and reduces capital intensity [8][9] Group 2: Strategic Importance - IsoEnergy views the Tony M mine as a unique opportunity to advance a fully permitted uranium mine towards restart without extensive new construction or permitting, aligning with U.S. federal initiatives to enhance energy security [3][6] - The bulk sample is a critical step in defining the scope and economics of a future production plan, which may include detailed mine planning and assessing the timing of a potential production decision [4][6] Group 3: Recent Initiatives and Economic Profile - In 2025, IsoEnergy reduced the uranium production royalty on the Utah Trust Lands Administration lease from 8% to 3%, and conducted tests that demonstrated over 90% recovery of uranium from mineralized material [9] - Enhanced evaporation studies have shown that Landshark evaporators can eliminate the need for evaporation-pond expansion, thus reducing permitting timelines and capital requirements [9] Group 4: Mineral Resource Estimates - The current mineral resource estimate for the Tony M mine includes 1,185,000 short tons of indicated resources at a grade of 0.28% eU3O8, containing approximately 6,606,000 pounds of eU3O8 [11]
IsoEnergy Initiates Bulk Sample Program at the Tony M Uranium Mine in Utah, a Key Step Toward a Potential Restart Decision