一个党员一面旗帜,万家灯火有我守护
Xin Lang Cai Jing·2026-01-08 03:31

Core Viewpoint - The article highlights the proactive measures taken by the State Grid Shanxi Ultra High Voltage Transmission Company to ensure power supply safety during adverse weather conditions, specifically heavy snowfall affecting critical transmission lines [1] Group 1: Emergency Response Measures - A specialized working group consisting of three members was formed to conduct emergency ice removal operations and aerial inspections using advanced equipment such as drones and ice removal robots [1] - The working group performed comprehensive inspections to identify safety hazards caused by snowfall, ensuring the safe operation of the power grid [1] Group 2: Technological Utilization - The use of fixed-wing drones equipped with high-definition imaging and infrared detection capabilities allowed for thorough inspections of two important transmission lines and 32 tower bases [1] - A total of two aerial inspection flights were completed following the snowfall, demonstrating the effective application of technology in maintaining power supply integrity [1] Group 3: Team Efforts and Community Commitment - The emergency power supply operation saw active participation from both the Party service team and the youth assault team, showcasing a strong commitment to mission responsibility [1] - The initiative emphasizes the importance of teamwork and leadership in safeguarding the community's power supply during challenging weather conditions [1]