客流“双破亿”!粤港澳“三联通”持续提升
Bei Jing Wan Bao·2026-01-08 11:42

Core Insights - The cumulative passenger flow through the Hong Kong-Zhuhai-Macao Bridge and the Guangzhou-Shenzhen-Hong Kong Express Rail Link has surpassed 100 million, indicating a significant enhancement in connectivity among the Guangdong-Hong Kong-Macao Greater Bay Area [1][2] Infrastructure Development - The Greater Bay Area has six major cross-river and cross-sea channels completed, including the Hong Kong-Zhuhai-Macao Bridge, which has drastically reduced travel time between Hong Kong and Zhuhai/Macao from 3 hours to approximately 45 minutes [2] - The Guangzhou-Shenzhen-Hong Kong Express Rail Link allows travel from Guangzhou South Station to Hong Kong West Kowloon Station in under 50 minutes and from Shenzhen Futian Station to Hong Kong in about 15 minutes [1][2] Policy and Regulation - Recent policies such as "Hong Kong vehicles northbound" and "Guangdong vehicles southbound" have been implemented, facilitating smoother cross-border travel and enhancing the integration of the Greater Bay Area [2][3] - The introduction of smart border control measures, including facial recognition and fingerprint scanning, has significantly simplified the crossing process, reducing wait times to around 10 seconds [3] Economic and Social Integration - The increase in passenger flow reflects the realization of the "one-hour living circle" concept, promoting the seamless movement of talent, capital, and innovation across the Greater Bay Area [2] - Enhanced infrastructure and supportive policies are fostering closer interactions among residents, contributing to a more integrated community within the Greater Bay Area [3][4]