去年云南省602个新能源项目纳入建设清单 装机规模达4283.693万千瓦
Xin Lang Cai Jing·2026-01-10 00:55

Core Insights - The province has announced three batches of renewable energy project development lists by 2025, involving 602 projects with a total installed capacity of 42.83693 million kilowatts, achieving over 70 million kilowatts of total renewable energy capacity by the end of November 2025, successfully meeting the "14th Five-Year Plan" target [1] - A new development plan for 221 renewable energy projects with a total capacity of 14.07633 million kilowatts has been issued, including 104 solar projects and 117 wind projects, distributed across 16 prefectures [1][2] Group 1 - The total installed capacity of renewable energy projects in the province exceeded 70 million kilowatts by November 2025, fulfilling the "14th Five-Year Plan" goals [1] - The third batch of renewable energy projects includes 221 projects with a total capacity of 14.07633 million kilowatts, consisting of 774.079 thousand kilowatts from solar projects and 633.554 thousand kilowatts from wind projects [1][2] - The projects are spread across 16 prefectures, with significant contributions from Chuxiong Yi Autonomous Prefecture (198.8 thousand kilowatts) and Honghe Hani and Yi Autonomous Prefecture (222.4 thousand kilowatts) [1] Group 2 - The plan emphasizes the need for resource allocation, factor assurance, and improved approval efficiency to accelerate project construction and on-time production [2] - Solar projects are required to commence construction by the end of June 2026, while wind projects must start by the end of October 2026 [2] - Strict supervision and monitoring will be enforced throughout the project implementation process, with measures in place for slow-progressing projects [2]