海河新添两座开启式大桥 (副)预计年内建成通车
Xin Lang Cai Jing·2026-01-10 14:19

Group 1 - The construction of two key bridges, Yuxin Bridge and Anyang Bridge, in Tianjin Binhai New Area is progressing rapidly, with both expected to be completed and open to traffic within the year [3][5] - The completion of these bridges will significantly reduce travel time between Yujia堡 Financial District and Dagu District from over 10 minutes to just 2 minutes, enhancing connectivity in the region [3][5] - The Yujia堡 Financial District is positioned as a national financial and business center, with over 100 registered companies and a registered capital exceeding 50 billion yuan, fostering a financial innovation cluster [5][7] Group 2 - Yuxin Bridge spans 945 meters with a main span of 106 meters designed as a vertical lift bridge, allowing for a clearance height of over 37.5 meters for maritime traffic [7][8] - Anyang Bridge features a double-leaf rotating design with a main span of 90 meters, making it the largest span lift bridge in Asia, directly connecting the Yuxiang area [10] - Both bridges incorporate a "green construction" philosophy, utilizing recycled materials and advanced BIM technology for efficient resource management and cost savings [10]

海河新添两座开启式大桥 (副)预计年内建成通车 - Reportify