Snow Lake Completes Highly Successful Drill Program at the Pine Ridge Uranium Project in Wyoming
Snow Lake Resources .Snow Lake Resources .(US:LITM) TMX Newsfile·2026-01-12 12:30

Core Insights - Snow Lake Resources Ltd. has announced the completion of its 2025 drill program at the Pine Ridge Uranium Project, confirming widespread uranium mineralization and establishing continuity across multiple areas [1][2][4]. Drill Program Results - The drill program consisted of 114 holes totaling 38,000 meters (125,000 feet), with significant results including multiple zones of mineralization [6]. - Notable assay results include: - 2.6 meters at 0.101% (1,010 ppm) U3O8 from 257.6 meters in hole PR25-093, including 2.0 meters at 0.124% (1,240 ppm) U3O8 [6][8]. - Additional results include 1.2 meters at 0.040% (400 ppm) U3O8 from 173.7 meters in PR25-103 and 1.2 meters at 0.032% (320 ppm) U3O8 from 254.7 meters in PR25-105 [6][9]. Geological Insights - The mineralization is hosted in at least two major sandstone units within the Tertiary Ft. Union Formation, which are geologically and hydrologically isolated, indicating potential for future In-Situ Recovery (ISR) development [5][10]. - The southwest portion of the project shows mineralization in a lower sandstone package compared to the eastern area, suggesting additional exploration opportunities [7]. Project Overview - The Pine Ridge Uranium Project is located in the Powder River Basin of Wyoming, a key area for U.S. uranium production, and is in proximity to Cameco's Smith Ranch Mill, which has a licensed capacity of 5.5 million pounds of U3O8 per annum [10].

Snow Lake Resources .-Snow Lake Completes Highly Successful Drill Program at the Pine Ridge Uranium Project in Wyoming - Reportify