陕西着力规范河道管理范围内建设项目整改工作
Shan Xi Ri Bao·2026-01-13 00:28

Core Viewpoint - The newly issued "Guidelines for the Preparation of Rectification Plans for Construction Projects within the Management Scope of Rivers in Shaanxi Province" aim to standardize rectification work for construction projects affecting river management, ensuring high-quality and efficient implementation [1][2]. Group 1: Guidelines Overview - The guidelines consist of 14 chapters covering various aspects such as scope, normative references, reasons for rectification, basic data analysis, project details, flood impact analysis, existing issues, and rectification goals and tasks [1]. - The rectification goals include eliminating and mitigating the impact of construction projects on river stability, flood flow, upstream and downstream flood protection, and the legal water rights of third parties, while ensuring the flood safety of the projects themselves and minimizing water quality impacts [1]. Group 2: Implementation Tasks - The guidelines emphasize the need for enhanced learning of water-related laws and regulations to improve awareness and compliance [1]. - Engineering measures are to be taken to eliminate and mitigate the impacts of construction projects on river flow, regional flood protection, flood emergency response, water engineering (including flood control projects), and the ecological water environment [1]. - Specific rectification tasks should be tailored to the actual conditions and characteristics of the construction projects, addressing identified issues with targeted goals [1].

陕西着力规范河道管理范围内建设项目整改工作 - Reportify