Core Viewpoint - The successful installation of the world's first 20-megawatt offshore wind turbine in Fujian marks a significant breakthrough in China's development of large-capacity wind turbine technology and offshore construction capabilities [1][2]. Group 1: Technological Advancements - The 20-megawatt offshore wind turbine features a hub height of 174 meters, equivalent to a 58-story building, and a rotor diameter of 300 meters, with a blade length of 147 meters [2]. - The turbine's design allows for a weight of less than 40 tons per megawatt, which is over 20% lighter than the industry average, reducing installation difficulty and foundational construction costs [2]. - The turbine incorporates an intelligent monitoring system that integrates laser radar and load sensors, ensuring safe autonomous operation in offshore environments [2]. Group 2: Environmental and Economic Impact - Once operational, the turbine is expected to generate over 80 million kilowatt-hours annually, meeting the electricity needs of approximately 44,000 households for a year, while saving about 24,000 tons of standard coal and reducing carbon dioxide emissions by around 64,000 tons [5]. - The development of this turbine is part of a national key research program aimed at renewable energy technology, contributing to China's energy security and green low-carbon transformation goals [2][5]. Group 3: Industry Positioning - The successful installation of the 20-megawatt turbine reinforces China's leading position in the global market for large-capacity offshore wind turbines, enhancing the overall upgrade of the design, manufacturing, and construction sectors within the industry [5]. - This project is a collaborative effort between the Three Gorges Group and Goldwind Technology, showcasing the achievement of 100% domestic production of key components [2].
全球首台20兆瓦海上风电机组在福建闽南海域完成吊装
Zhong Guo Fa Zhan Wang·2026-01-14 07:04