Core Insights - The article highlights the significant growth of renewable energy in Shandong, with an average annual increase of nearly 25% in installed capacity since the 14th Five-Year Plan, marking a historic shift from coal-dominated energy production to a more diversified energy structure [1][3] Group 1: Renewable Energy Development - Shandong has surpassed 100 million kilowatts in non-fossil energy generation capacity, historically exceeding coal power for the first time, contributing to high-quality economic development [1] - The HG14 project, the world's largest open-sea photovoltaic project, is set to be fully connected to the grid by the end of 2025, with the capacity to generate 1.78 billion kilowatt-hours annually, sufficient for 2.67 million urban residents [1][3] - As of November 2025, Shandong's non-fossil energy generation capacity is expected to reach 135 million kilowatts, accounting for 53.6% of the total power generation capacity, with solar power alone reaching 91.728 million kilowatts, maintaining the top position in the country for eight consecutive years [3] Group 2: Project Implementation Challenges - The HG14 project faced initial challenges in obtaining sea area usage rights due to existing aquaculture claims in the area, complicating the construction process [2] - A breakthrough occurred in November 2023 when the Ministry of Natural Resources issued a notice allowing for layered rights management of marine areas, enabling the coexistence of aquaculture and photovoltaic projects [2] - The project successfully obtained property rights for water surface and seabed space by July 2024, becoming the first in the country to implement layered marine rights [2] Group 3: Technological Innovations - The HG14 project employs innovative construction techniques, including a four-pile stable guiding frame to ensure the accurate positioning and leveling of solar panels, preventing shading and maximizing energy efficiency [3] - The project was completed and connected to the grid within 18 months, showcasing the effectiveness of these innovative methods in expediting renewable energy deployment [3]
每3度就有1度是绿电,山东新型能源体系建设取得重大进展
Qi Lu Wan Bao·2026-01-14 08:08