沪昆高速贵阳至安顺段扩容项目百花湖大桥顺利通过荷载试验
Xin Lang Cai Jing·2026-01-14 12:27

Core Viewpoint - The successful load test of the Baihua Lake Bridge marks a significant milestone for the Gui'an Expansion Project, ensuring the foundation for the entire highway's operation is solid [1][3]. Group 1: Project Overview - The Gui'an Expansion Project, led by Guizhou Highway Group and supported by other stakeholders, spans a total length of 90.722 kilometers, connecting Guiyang City to Anshun City [4]. - The project is designed to meet highway standards with a design speed of 100 kilometers per hour [4]. Group 2: Bridge Specifications - The Baihua Lake Bridge measures 1,086 meters in length and features a hybrid beam single-tower cable-stayed design, making it the largest of its kind in the province [3]. - The main tower of the bridge is a reinforced concrete diamond-shaped spatial tower, standing at a height of 219 meters [3]. Group 3: Load Test Results - The load test consisted of static and dynamic load tests, confirming that the bridge meets design requirements with clear stress under various conditions, smooth line shape, and stable cable forces [3].

沪昆高速贵阳至安顺段扩容项目百花湖大桥顺利通过荷载试验 - Reportify