1月26日起铁路调图 兴义南至重庆西 最快仅需4小时18分
Xin Lang Cai Jing·2026-01-14 16:31

Core Viewpoint - The Chengdu Railway Bureau Group Company announced the implementation of a new train operation schedule starting from January 26, which aims to enhance railway transportation capacity in the Southwest region by introducing additional train services and optimizing existing routes [1] Group 1: New Train Operation Schedule - The new train operation schedule will include a total of 1,076 pairs of scheduled passenger trains, an increase of 8 pairs compared to the previous schedule [1] - The operation will feature 5.5 pairs of direct high-speed trains to East China, South China, and Kunming, including 3 pairs for regular lines and 2.5 pairs for peak lines [1] - There will be an increase of 9.5 pairs of trains within the region, with 7 pairs for regular lines and 2.5 pairs for peak lines [1] Group 2: Travel Time Improvements - The travel time from Xingyi South to Guiyang North will be reduced to a minimum of 1 hour and 50 minutes [1] - Travel times to Chongqing West and Chengdu South will be shortened to 4 hours and 18 minutes, and 6 hours and 4 minutes, respectively, enhancing connectivity between tourism resources and urban development along the Sichuan-Guizhou-Chongqing corridor [1] Group 3: Additional Train Services - The schedule will also optimize and adjust some regular passenger train services, adding 2 trains each from Urumqi to Longxi, and from Chongqing West to Hohhot and Kashgar [1] - Additionally, 2 tourist trains will be added from Xi'an to Yichang East, operating in the evening and morning [1]