Group 1 - The core investment plan for the "14th Five-Year Plan" period is projected to reach 4 trillion yuan, representing a 40% increase compared to the previous plan, aimed at enhancing effective investment and promoting high-quality development of the new power system industry chain and supply chain [1] - The company aims to achieve an annual increase of approximately 20 million kilowatts in installed capacity for wind and solar energy, targeting a 25% share of non-fossil energy consumption and a 35% share of electricity in terminal energy consumption by the end of the "14th Five-Year Plan" [1] - The company will enhance system regulation capabilities and optimize the layout of pumped storage stations to support large-scale development of new energy storage, improving the operational support and grid integration of renewable energy [1] Group 2 - The company plans to establish a new power grid platform characterized by collaborative main and distribution networks, further solidifying the "West-to-East Power Transmission" and "North-to-South Power Supply" energy transmission networks [2] - The construction of ultra-high voltage direct current transmission channels will accelerate, with cross-regional and cross-provincial transmission capacity expected to increase by over 30% compared to the end of the "14th Five-Year Plan" [2] - The company will focus on strengthening key core technology research and development, aiming to become a globally influential source of original technology in the energy and power sector [2] Group 3 - The company emphasizes enhancing operational efficiency and achieving intrinsic development by integrating the "five values" throughout its operational processes and optimizing long-term business strategies and resource allocation [3] - The company will continue to play a stabilizing role in the national economy through sustained high-intensity investment, accelerating the construction of a new power grid platform that includes main and distribution networks as well as smart microgrids [3] - The company aims to contribute significantly to the construction of a new energy system and the establishment of an energy powerhouse by ensuring national energy security through its investments [3]
国家电网“十五五”投资计划出炉
Zhong Guo Dian Li Bao·2026-01-15 05:39