专线专用,绿电可直抵用户
Liao Ning Ri Bao·2026-01-16 01:06

Core Viewpoint - The implementation of the "Liaoning Province Green Electricity Direct Connection Construction Implementation Plan (2025-2027)" aims to promote the integration of renewable energy production and consumption, facilitating cost reduction, carbon reduction, and sustainable development [1] Group 1: Green Electricity Direct Connection - Green electricity direct connection refers to the supply of renewable energy such as wind, solar, and biomass directly to a single electricity user without connecting to the public grid [1] - There are two types of direct connection: grid-connected and off-grid. Grid-connected systems allow for flexibility with "self-use and surplus electricity feeding into the grid," while off-grid systems operate independently but require higher technical standards [1] Group 2: Implementation Guidelines - The principle of "source determined by load" should be followed to scientifically determine the type and scale of renewable energy sources for green electricity direct connection [2] - For grid-connected green electricity direct connection, the annual self-use electricity from renewable energy should account for no less than 60% of the total available generation, and at least 30% of total electricity consumption, with a target of at least 35% before 2030 [2] - New renewable energy projects can apply for a model where "self-use is primary and surplus electricity is secondary," with the surplus electricity not exceeding 20% of the total available generation based on annual renewable energy consumption [2]

专线专用,绿电可直抵用户 - Reportify