Core Viewpoint - The Jiangyin Lihua Power Plant's terminal has completed its renovation and is set to enhance operational efficiency through automation, green technology, and smart management, significantly improving coal handling and power generation processes [1][2][3]. Group 1: Terminal Renovation and Automation - The renovation of the terminal includes the installation of three 1,500-ton unmanned unloading machines that will automate the coal transfer process from ships to conveyor belts, streamlining operations [1][2]. - The new terminal can accommodate 70,000-ton vessels, doubling the previous capacity, and is expected to increase annual throughput capacity significantly [2][4]. - The entire coal transportation process will be dust-free, aided by a fully enclosed 700-meter conveyor belt, contributing to a more environmentally friendly operation [2][3]. Group 2: Environmental and Operational Benefits - The renovation is projected to enhance power production efficiency by at least 5%, while also creating a healthier work environment for staff by eliminating dust and reducing manual labor [2][3]. - The terminal's green initiatives, including a wastewater collection pool and solar-powered lighting, are expected to save energy by 20% [2]. - The project serves as a model for future developments in the industry, promoting automation, green practices, and smart technology in power generation [3][4]. Group 3: Future Developments - A second terminal at the Lihua Power Plant is also set for similar upgrades, further advancing the goals of automation and environmental sustainability [3]. - The Jiangyin port is focusing on modernizing its infrastructure to enhance operational efficiency and support urban development, with several key projects expected to be completed by 2025 [4].
无锡电厂码头迎来“无人化”时代,生态友好电力扑面而来
Yang Zi Wan Bao Wang·2026-01-16 06:02