中国石油广西石化公司两套EVA装置在钦州港开工建设
Zhong Guo Xin Wen Wang·2026-01-16 12:45

Core Viewpoint - China Petroleum Guangxi Petrochemical Company has commenced the construction of two EVA production facilities, which are expected to enhance the domestic supply of high-end chemical materials and support the growth of strategic emerging industries in China [1][3]. Group 1: Project Details - The company is building a 300,000 tons/year EVA facility using tubular technology and a 100,000 tons/year H-EVA facility using kettle technology, both employing LUPOTECH technology from LyondellBasell [3]. - The tubular EVA facility is aimed at large-scale production of photovoltaic-grade EVA, scheduled for completion by the end of December 2027, while the H-EVA facility is focused on high-end specialty products, expected to be completed by the end of February 2028 [3]. Group 2: Market Impact - The produced EVA products will cater to key sectors such as photovoltaic film, high-end cables, foamed products, and medical devices, addressing the domestic supply gap for high-grade photovoltaic EVA and reducing reliance on imports [3]. - The photovoltaic-grade EVA products will meet top industry standards in terms of light transmittance, weather resistance, and cross-linking degree, ensuring the long-term stable operation of high-efficiency photovoltaic modules [3]. - High-end cable EVA will offer excellent temperature resistance, insulation, and aging resistance, suitable for applications in new energy vehicles and smart grids [3]. - The foamed products will provide lightweight, environmentally friendly, and cushioning properties, serving as alternatives to traditional materials in high-end packaging and automotive interiors [3].

PETROCHINA-中国石油广西石化公司两套EVA装置在钦州港开工建设 - Reportify