三峡枢纽北斗高精度监测系统完成建设并投入试运行
Xin Lang Cai Jing·2026-01-17 13:34

Core Insights - The Three Gorges Hub Beidou High-Precision Monitoring System has been completed and is in trial operation, marking the first large-scale application of Beidou in the safety monitoring of major water conservancy projects in China [1] - This development signifies a critical step towards achieving a "self-controllable, efficient, and intelligent" safety monitoring system for the Three Gorges Project [1] Group 1 - The system utilizes a "single Beidou" model, where the entire process from satellite signal reception to data transmission and backend analysis is 100% based on independently developed and operated Beidou Global Navigation Satellite System [1] - The system has achieved nationwide production and full autonomy from core hardware to calculation software, resulting in millimeter-level high-precision perception capabilities [1]

三峡枢纽北斗高精度监测系统完成建设并投入试运行 - Reportify