Core Viewpoint - The new train operation schedule will be implemented nationwide starting from January 26, 2026, significantly enhancing the capacity and convenience of the Hefei railway hub [1][2]. Group 1: Capacity Enhancement - The Hefei railway hub will operate a total of 348 pairs of passenger trains, an increase of 14.5 pairs compared to the fourth quarter of 2025 [3]. - The train operation structure includes 324.5 pairs for regular lines, 2.5 pairs for weekend lines, and 20 pairs for peak lines, allowing for flexible responses to varying passenger flow demands [4]. Group 2: Station Developments - Hefei West Station will operate 30 pairs of passenger trains, connecting to major cities such as Hangzhou, Shanghai, and Xi'an, thereby alleviating pressure on Hefei Station and Hefei South Station [4]. - The operational structure of the Hefei railway hub will evolve into a "three-legged" configuration with Hefei South Station, Hefei Station, and Hefei West Station, significantly increasing overall capacity [4]. Group 3: New Train Services - New high-speed train services will connect Hong Kong West Kowloon to Shanghai Hongqiao, marking a milestone in enhancing economic and cultural exchanges between Anhui and Hong Kong [9]. - The train services will also see upgrades, with several original trains transitioning from regular to high-speed services, thus reducing travel times and improving passenger experience [9]. Group 4: Network Expansion - The train network will expand significantly, with routes such as Taiyuan South to Shanghai Hongqiao extending to Fuzhou South, and Hefei South to Quzhou extending to Jiangshan, increasing accessibility to more destinations [9]. - New connections, such as the K752/3/2 train from Xinyang to Shanghai Songjiang, will strengthen medium to long-distance connections in key directions [9].
合肥西站具体车次来了!1月26日起实施!
Xin Lang Cai Jing·2026-01-18 01:55