坚决打好污染防治攻坚战 | 守护一方绿 点亮万家灯
Guang Xi Ri Bao·2026-01-18 03:26

Core Insights - The Nanning Pumped Storage Power Station in Guangxi is designed to balance construction and environmental protection, showcasing a successful integration of large-scale engineering with ecological considerations [1][2] - The project has achieved a high utilization rate of excavation materials, exceeding 94%, and significantly reduced land use and transportation of waste [1] - The station is set to generate 2.5 billion kilowatt-hours of clean energy annually, reducing carbon emissions by approximately 2.2 million tons, equivalent to the carbon absorption of over 60,000 acres of forest [3] Environmental Protection Efforts - Over 90% of construction wastewater is recycled, and rainwater is collected for dust control and maintenance [2] - A unique initiative involved the relocation and preservation of a rare plant species, the Cyathea, with a survival rate of over 96% after transplantation [2] - The project has established a technical standard for the relocation and protection of the Cyathea, marking a significant advancement in ecological conservation practices [2] Economic Impact - The total investment in the power station is approximately 8 billion yuan, with an expected annual tax revenue of around 100 million yuan for the local area [3] - The construction phase has stimulated related investments exceeding 16 billion yuan, contributing to local economic development [3]