Core Viewpoint - The Shandong Regional Center of China Energy Construction (中国能建) is proactively preparing for significant snowfall and temperature drops from January 17 to 20, ensuring the safety and smooth operation of highways in the region [1] Group 1: Risk Management and Safety Measures - The Shandong Regional Center has initiated a comprehensive risk assessment and safety training program focusing on winter road conditions, particularly addressing issues like icy roads and visibility problems due to snow [3] - A targeted inspection campaign has been launched to identify and address potential hazards on highways, including road surface conditions and traffic signage, with a focus on historically problematic areas during snowfall [5] - The center has established a detailed inspection ledger for risk-prone sections of the highways, implementing immediate corrective actions for identified issues to mitigate risks associated with snowfall [5] Group 2: Emergency Preparedness - The maintenance project team has entered a "wartime state" to enhance emergency snow removal capabilities, with all personnel on standby and equipment being tested for readiness [7] - Over 3,000 tons of de-icing agents have been prepared, with a strategic distribution plan based on the risk levels of different highway sections, ensuring 24-hour monitoring of supplies [7] - The center is committed to a dynamic response strategy, adjusting resources based on real-time weather updates to ensure safe and efficient highway operations during and after snowfall [10]
雪讯至备战先行 中国能建葛洲坝交投公司全力筑牢高速安全防线