Core Insights - Bedford Metals Corp. has completed its Phase 3 Exploration program at the Sheppard Lake Uranium Project, with drilling set to resume in spring 2026 [1] - The exploration program included radiometric surveys and grab sampling, identifying several anomalous zones [2][3] - The company emphasizes environmentally responsible exploration and collaboration with local indigenous communities [7] Exploration Program Details - The field program involved 3 radiometric surveys at targeted locations, resulting in 3,644 readings that delineated anomalous zones, particularly at TZ-2 west and TZ-1 [2] - A total of 18 grab samples were collected, with CPS readings reaching up to 10,609 in the Silica Cap Zone [3] - The drilling faced challenges due to cold weather, resulting in only 298.5 meters drilled, with two holes testing the area south of TZ-2 [5] Sample Analysis - A total of 92 samples, including grab samples and drill core, were sent to the SRC Geoanalytical Laboratory for multi-element, U3O8, and boron assays [6]
Bedford Metals Completes 2025 Exploration Program At Sheppard Lake Uranium Project
Thenewswire·2026-01-19 13:00