Core Insights - The successful completion of the East Side Road project of No. 44 Middle School in Xicheng District addresses traffic issues in the area, enhancing convenience, safety, and ecological aspects for local residents and students [1][3] - The project employs innovative technology, specifically a linear air membrane, to tackle construction challenges in the old city, marking it as the first of its kind in municipal road construction in the city [2] Group 1: Project Overview - The East Side Road project was initiated in September last year to improve traffic microcirculation and resolve transportation difficulties in the old city [2] - The linear air membrane covers an area of 3,505 square meters, with dimensions of 215 meters in length, 18 meters in width, and 9 meters in height, showcasing significant technological advancements [2] Group 2: Technical Innovations - The project features a "sandbox mold" foundation design that enhances wind resistance and stability, allowing for a 60% reduction in construction time compared to traditional methods [2] - A dual defense system combining human and technical measures has been implemented, achieving over 90% reduction in dust emissions and a 15-decibel decrease in noise levels [2] Group 3: Socioeconomic Impact - The road project not only improves transportation but also enhances municipal infrastructure, including water supply and drainage systems, thereby increasing the area's capacity to support urban facilities [3] - The completion of the project serves as a practical example for urban renewal and traffic improvement initiatives, responding to community aspirations for a better quality of life [3]
技术创新破解老城施工难题
Xin Lang Cai Jing·2026-01-19 17:08