Core Viewpoint - Zhengzhou is facing a significant winter challenge with heavy snowfall and low temperatures, testing the city's governance capabilities in emergency response and snow removal efforts [1] Group 1: Emergency Response and Operations - Zhengzhou Public Group's smart sanitation team mobilized 6,186 personnel and deployed 1,324 pieces of specialized equipment for snow removal by January 19, 19:00 [1] - The smart sanitation system acts as the "brain" of snow removal operations, enabling real-time monitoring of temperature and snowfall, and optimizing resource allocation through a grid-based operation model [2][3] - The integration of smart technology allows for efficient coordination and rapid response, transforming passive measures into proactive strategies for snow management [3] Group 2: Equipment and Human Collaboration - A combination of advanced snow removal machinery, including large snow rollers and multifunctional snow removal vehicles, is effectively clearing major urban roads [6] - The deployment of 2,059 tons of environmentally friendly de-icing agents has been conducted to prevent ice formation on road surfaces [6] - Thousands of sanitation workers are actively engaged in manual snow removal in areas where machinery cannot operate, ensuring safe passage for citizens [6][7] Group 3: Challenges and Strategies - The ongoing snowfall and temperatures dropping to -9°C present significant challenges for maintaining road safety and preventing ice formation [7] - The operational strategy includes a "no rest for machines" approach, ensuring all equipment operates at full capacity to address snow and ice effectively [7] - Continuous monitoring and rapid response measures are in place to ensure that road conditions remain safe for citizens, demonstrating the city's commitment to effective governance during extreme weather [7]
郑州环卫人跑出清冰除雪“加速度”
Zheng Zhou Ri Bao·2026-01-20 00:34