Cartier Cuts 29.6 g/t Au over 1.7 m And 13.2 g/t Au over 1.0 m and Unlocks Two New High-Grade Gold Zones in Strategic Gap Between Chimo and East Chimo Deposits at Main (Cadillac)
Globenewswire·2026-01-20 12:30

VAL-D’OR, Quebec, Jan. 20, 2026 (GLOBE NEWSWIRE) -- Cartier Resources Inc. (″ Cartier ″ or the ″ Company ″) (TSXV: ECR; FSE: 6CA) is pleased to announce the sixth batch of results from Main Sector from the 100,000-m drilling program (2 drill rigs) on its 100%-owned Cadillac Project, located in Val-d’Or (Abitibi, Quebec). Strategic Highlights from Main Sector Drill Hole Results (Figures 1 to 4)5B3/5C3 Zones CA25-300 intersected 29.6 g/t Au over 1.7 m including 54.3 g/t Au over 0.9 m (5B3 Zone).CA25-303 grade ...

Cartier Cuts 29.6 g/t Au over 1.7 m And 13.2 g/t Au over 1.0 m and Unlocks Two New High-Grade Gold Zones in Strategic Gap Between Chimo and East Chimo Deposits at Main (Cadillac) - Reportify