Core Viewpoint - The article highlights the efforts of Beijing Urban Construction Second Company in integrating photovoltaic technology with desertification control in Inner Mongolia, showcasing the challenges and dedication of the team involved in the project [3][4][5]. Group 1: Project Overview - The project is located in a harsh desert environment characterized by extreme weather conditions, including visibility issues due to sandstorms and temperature fluctuations exceeding 40°C [3]. - The project involves the construction of 35 sub-arrays, each with a capacity of nearly 3 megawatts, requiring the installation of over 4,000 photovoltaic panels and nearly 1,000 supports [4]. Group 2: Team Efforts - The project is managed by a young couple, Duan Jun and Xu Shuang, who both work for Beijing Urban Construction Second Company, demonstrating a strong commitment to their roles despite the challenging conditions [5][6]. - Duan Jun is responsible for technical assurance and process acceptance, ensuring precision in every detail of the construction process, while Xu Shuang manages business operations and contract compliance [5][6]. Group 3: Challenges and Solutions - The team faces significant logistical challenges, including difficult transportation conditions due to soft sand, which limits vehicle access to the site [4]. - Both Duan Jun and Xu Shuang actively engage in on-site inspections and data verification to ensure project accuracy and compliance, reflecting their dedication to quality and efficiency [6]. Group 4: Environmental Impact - The project aims to combine desertification control with green energy production, contributing to environmental sustainability and transforming the desert landscape [6]. - The integration of photovoltaic panels is already contributing to the power grid, marking a significant step towards achieving the project's dual goals of ecological restoration and renewable energy generation [6].
扎根荒漠书写光伏治沙答卷
Xin Lang Cai Jing·2026-01-20 16:47