清水县:樊河岸边起“金堤”
Xin Lang Cai Jing·2026-01-21 01:00

Core Viewpoint - The completion of the Yan Chuan Village river embankment project along the Fan River represents a significant investment in local infrastructure, enhancing flood protection and providing employment opportunities for local residents through a labor-based compensation model [1][2][3][4]. Group 1: Project Overview - The newly constructed river embankment spans 2.615 kilometers and serves as a robust flood defense, protecting nearby villages and farmland [1]. - The project, with a total investment of 8.29 million yuan, emphasizes the principle of prioritizing local labor for employment [2]. Group 2: Employment and Skills Development - The project has created local job opportunities, allowing residents to earn income without leaving the village, thus enhancing their quality of life [2]. - A "training + on-the-job" model was implemented, enabling villagers to acquire practical skills in construction, which has led to the emergence of local "building experts" [2]. Group 3: Flood Protection and Infrastructure - The new embankment is designed according to flood prevention standards, featuring a main structure and protective slope, ensuring its durability [3]. - Additional infrastructure, including three agricultural bridges, six drainage pipes, and two water conduits, has been constructed to address drainage issues and facilitate agricultural machinery access [3]. Group 4: Environmental and Economic Impact - The project incorporates eco-friendly construction practices, such as soil reuse and wastewater recycling, minimizing environmental disruption [4]. - The revitalized riverbank is expected to promote local economic development through the enhancement of agricultural land and the potential for rural tourism [4].